keithski122
Member
- Messages
- 1,908
Just primering the roof of my beetle and getting shriveling.
I previously put on two coats of lechler epoxy to a bare roof, dried and then did some filler repairs.Keyed off the whole roof, two coats of epoxy 20 mins between coats, left half an hour and put on one coat of lechler green ti.
Looking good after 20mnis so started putting on another green ti coat.
Paint has started shriveling, now I'm guessing this is poss due to too short drying times between coats.Did it this way on other panels with no probs.
What times should I be leaving and what can I do now?
Cheers.
I previously put on two coats of lechler epoxy to a bare roof, dried and then did some filler repairs.Keyed off the whole roof, two coats of epoxy 20 mins between coats, left half an hour and put on one coat of lechler green ti.
Looking good after 20mnis so started putting on another green ti coat.
Paint has started shriveling, now I'm guessing this is poss due to too short drying times between coats.Did it this way on other panels with no probs.
What times should I be leaving and what can I do now?
Cheers.