Hi All. New here and new to welding.
I'm producing a prototype on a small budget and the welding is getting expensive. So I brought a cheap welder and intend to "teach" myself, I have lots of scrap!
The problem I have is I've got some 80mm x 3mm box section that I want to mount 50mm tubes in each end. So I had some "lumps" turned out of solid engineering steel 74mm2 x 30mm. The tube mounts in them. Now I want to mount the lumps in each end of the box and I've just read it's difficult to do this.
What would any of you think of say drilling a 10mm hole through the box into the lumps, inserting a bit of 10mm steel tube, then creating a puddle of weld to join it all together?
I've thought of grinding a strip out, say about 50mm long, inserting a length of 10mm bar, then welding.
Any thoughts, hints or tips most welcome.
Many thanks
Dave
I'm producing a prototype on a small budget and the welding is getting expensive. So I brought a cheap welder and intend to "teach" myself, I have lots of scrap!
The problem I have is I've got some 80mm x 3mm box section that I want to mount 50mm tubes in each end. So I had some "lumps" turned out of solid engineering steel 74mm2 x 30mm. The tube mounts in them. Now I want to mount the lumps in each end of the box and I've just read it's difficult to do this.
What would any of you think of say drilling a 10mm hole through the box into the lumps, inserting a bit of 10mm steel tube, then creating a puddle of weld to join it all together?
I've thought of grinding a strip out, say about 50mm long, inserting a length of 10mm bar, then welding.
Any thoughts, hints or tips most welcome.
Many thanks
Dave