Looking to do some extensive work on the shop this year. Re-roof and raise get a nice level floor in, chuck and sell a load of stuff I don't use, get proper extraction in place etc. etc. These jobs just tend to grow so its getting done off plan and on cost / finished on time
On the drawing board at present and have a pretty good idea how I am setting things up but I don't know how to do the electrical calcs as regards if I need a new supply cable and how to state the total max running load I should stipulat.
Here is what I want to put in (all single phase)
20 off LED bright white spots into ceiling
1 off 24.5 amp welder supply with three options to plug in around the place (only running one though)
1 off 32 amp welder supply again three option points with only one in use at a time
the above 32 / 24.5 supplies might feasibly be used at the same time
750 w extraction
1100 w saw
1100 w drill
8 off double sockets (max four or so in use at a guess really more about were I need them for grinders / chargers and such)
Obviously even with two persons in there we couldn't run the lot at one time so its obviously not a straight forwards addition.
I already have a supply in that was put in only a few years ago but it is fused at another outbuilding be good if it was ok but I suspect it will be a new cable from the meter and keeping that for the lights and 13amp sockets with some slack. Like I say its not my thing
On the drawing board at present and have a pretty good idea how I am setting things up but I don't know how to do the electrical calcs as regards if I need a new supply cable and how to state the total max running load I should stipulat.
Here is what I want to put in (all single phase)
20 off LED bright white spots into ceiling
1 off 24.5 amp welder supply with three options to plug in around the place (only running one though)
1 off 32 amp welder supply again three option points with only one in use at a time
the above 32 / 24.5 supplies might feasibly be used at the same time
750 w extraction
1100 w saw
1100 w drill
8 off double sockets (max four or so in use at a guess really more about were I need them for grinders / chargers and such)
Obviously even with two persons in there we couldn't run the lot at one time so its obviously not a straight forwards addition.
I already have a supply in that was put in only a few years ago but it is fused at another outbuilding be good if it was ok but I suspect it will be a new cable from the meter and keeping that for the lights and 13amp sockets with some slack. Like I say its not my thing