Setting up 100 ltr tank with 2" bore BSP outlet. (Was reduced to 1/2" bore BSP, removed with heat and large hammer)
Looking to tee off to blast cabinet and garage pipework, which will be 1" bore BSP plus 22mm copper & stainless (because I have lots of salvaged pipe and compresion fittings )
With a view to the future, and a larger output compressor , should I tee off at 1.1/2 bore BSP or is 1" bore BSP sufficient. Will probably tandem another 100 ltr tank to above.
While standardising with 1" bore BSP is easier/cheaper for future reconfiguring I do not want to create a restriction at the tank. Valves will be full bore.
Your thoughts appreciated.
Looking to tee off to blast cabinet and garage pipework, which will be 1" bore BSP plus 22mm copper & stainless (because I have lots of salvaged pipe and compresion fittings )
With a view to the future, and a larger output compressor , should I tee off at 1.1/2 bore BSP or is 1" bore BSP sufficient. Will probably tandem another 100 ltr tank to above.
While standardising with 1" bore BSP is easier/cheaper for future reconfiguring I do not want to create a restriction at the tank. Valves will be full bore.
Your thoughts appreciated.