I have a 32mm diameter hole through a 1200mm thick wall and will be running 28mm copper pipe through it to connect my Rayburn up to the central heating. A few people have mentioned sleeving the pipe which I should probably do. Given the dimensions above what can I use as a sleeve? needs to take the pipe internally and I need to be able to pull it through a 32mm hole. 32mm waste pipe OD is more like 34-35mm so that wont work.