I have a good supply of recycled kerb mix/scalpings - could I use this all the way up or would you advise 4" of type1 or recycled concrete to start? It will be contained on all edges by block paving and used as a parking area.
The ground conditions will determine what you can “get away with” but I always put some type 1 down (100mm minimum). If the topping is going to be temporary you may as well put down a base that can be utilised again later.