zeppelin builder
Member
- Messages
- 2,166
- Location
- peoples republic of scotland
as for quality ive seen some howlers all it takes is the slag to be a bit damp ,or the head to not have enough offset giving cold lap or lack of fusion big time
some lads were doing 6 inch sch 160 with a paddle held in one hand to hold the slag back , incidentaly in the yards you got a helper with you if you were on saw
(slag monkey) who would chip the slag riddle it and put it in the drier hopper ,wouldnt call it pipe bashing as its regarded as a semi skilled job in these parts
some lads were doing 6 inch sch 160 with a paddle held in one hand to hold the slag back , incidentaly in the yards you got a helper with you if you were on saw
(slag monkey) who would chip the slag riddle it and put it in the drier hopper ,wouldnt call it pipe bashing as its regarded as a semi skilled job in these parts