Paul99
Member
- Messages
- 606
I managed to get a bit more done on the jeep. Started off a few days ago by making a start on the inner wheel arch / arch liner whilst I still had the ends of the original sills in place to work off:
To form the shape of the front inner corner of the wheel arch I need to sort the foot well out so today got onto cutting the rear seat support off then hacking out the rotten section of floor. That that allowed for a better look at the inner sill - I knew it was very poorly repaired before we had it and it was coming out anyway but I didn't expect to find a patch on top of a patch on top of the original and none of the rot cut out . 20 mins and a few slitting discs later and most of both inner and outer sills and the internal stiffeners were history:
I spent the rest of the afternoon replacing the internal stiffener (painted black) before shaping and welding in a new inner sill:
The edge of the floor was cut away to weld the inner sill from above I'll patch the floor up later on. If all goes to plan the outer sill will be made and welded in tomorrow and I'll have made a start on making the replacement the floor panel I can then get back to working on the inner arch.
To form the shape of the front inner corner of the wheel arch I need to sort the foot well out so today got onto cutting the rear seat support off then hacking out the rotten section of floor. That that allowed for a better look at the inner sill - I knew it was very poorly repaired before we had it and it was coming out anyway but I didn't expect to find a patch on top of a patch on top of the original and none of the rot cut out . 20 mins and a few slitting discs later and most of both inner and outer sills and the internal stiffeners were history:
I spent the rest of the afternoon replacing the internal stiffener (painted black) before shaping and welding in a new inner sill:
The edge of the floor was cut away to weld the inner sill from above I'll patch the floor up later on. If all goes to plan the outer sill will be made and welded in tomorrow and I'll have made a start on making the replacement the floor panel I can then get back to working on the inner arch.
Last edited: