Maker
Most folk just call me; Orange Joe
- Messages
- 10,543
- Location
- Keeler crater
The original front pulley seems to be a two step pulley with steps of (approximately) 3/4" and 1" which, with a 5" pulley that motor had originally (I think) would give speeds that match the rating plate. It had a 2" "sleeve" on top of it. The belt is too ling for the small step but I can use the big step and the "sleeve" to get either 800 or 400 RPM.
EDIT: The belt slips really badly, so much so that it pretty much can't be used as it is. The speeds are far too slow anyway, I need to make some new pulleys. I still like the idea of a Reeves drive but as that's quite complicated I might go for stepped pulleys (with a lot of steps) and a Vee belt.
EDIT: The belt slips really badly, so much so that it pretty much can't be used as it is. The speeds are far too slow anyway, I need to make some new pulleys. I still like the idea of a Reeves drive but as that's quite complicated I might go for stepped pulleys (with a lot of steps) and a Vee belt.
Last edited: