Back in the late '80s I did controls for two primary schools with heat pump and oil boiler combined systems. If the HP couldn't maintain the required flow temp, the boiler kicked in with a mixing valve to mix boiler circuit into the low grade circuit. If that couldn't keep up with building demand, the HP shut down and the boiler could drive the heating circuit up to full temperature.This tells me what the makers think about ASHPs, only real issue is the price