Sergei Slovenija
Member
- Messages
- 1,267
- Location
- Slovenija Ljubljana
Finish
5 days of fitting, trimming, tacking parts together, at height and at joints. Tedious plumbing work, removal of powder paint from joints, incl. paint got inside the flanges. Welding took one day and a little today on the sight glass, the cherry on the cake. I welded the outside of a flange with a wall thickness of 1.5 mm and a base with a wall thickness of 4 mm. Then I welded the step from the inside and smoothed it out on a pulse of 30 hertz and 105 amperes.
5 days of fitting, trimming, tacking parts together, at height and at joints. Tedious plumbing work, removal of powder paint from joints, incl. paint got inside the flanges. Welding took one day and a little today on the sight glass, the cherry on the cake. I welded the outside of a flange with a wall thickness of 1.5 mm and a base with a wall thickness of 4 mm. Then I welded the step from the inside and smoothed it out on a pulse of 30 hertz and 105 amperes.