qwakers
Member
- Messages
- 2,116
- Location
- cornwall, united kingdom
this is going to take a while.next thing workshop related is the need for more offroad parking. there's only one place left...
this took hours, the absolute gits that put this wall up used 6" block. who does that?!
another long overdue job was to get power out the front. if id had any sense when i was building up the place originally i would have put water out here too.. however that's not happening now, so just power it is.
and im powering it off a fused spur, so i can switch it off when not in use.
8 bags a week....
i probably wont bother actually bagging the rest, i just needed a idea of the volume i could get in 8 bags. it takes longer to fill the bags than to shovel the soil...