- Messages
- 13,398
- Location
- England
Quick little job before I went to site this morning.. just a little 'letter box' to slip a 300mm lasnek cable basket through.
Slip through the cut out in the wall and weld the second flange on in situ. Covers the exposed insulation in the wall panels and gives a smooth edge.
It's the only thing I've made today.. spent rest of it just installing cable management and isolators.
Slip through the cut out in the wall and weld the second flange on in situ. Covers the exposed insulation in the wall panels and gives a smooth edge.
It's the only thing I've made today.. spent rest of it just installing cable management and isolators.